 |
Mounting Adhesive
Construction adhesive is applied to the back of each panel. Panels are placed
in the desired location. Temporary support is required to avoid slippage.
|
 |
Mechanical Clips
The panel clips are mounted onto the panels at the time of shipment. The wall clips
are installed on the wall at the location established by the position of the panel clips |
 |
Hook and Loop Fasteners
The loop side of the fastener is applied to the panel at time of shipment. The hook
is attached to its mate and when installing, the tape backing is removed and the panel is
positioned on the wall. Permanent support is required. |
 |
Concealed Splines
Panels with concealed spline attachments are provided with kerfs along the edges of the
panels. The spline then inserts into one panel and is mounted onto the wall.
Adjoining panels are inserted into the remaining half of the spline. |
 |
Impaling Clips
Impaling clips are mechanically mounted to the wall. The panels are then set into
the impaling clips. Adhesive is used for additional support. |